Go to content Go to navigation Go to search

One year

Yesterday was the one year anniversary of Anne and I getting our house. Since then we've been very very busy and we're nowhere close to done. But all in all it's been a good experience and I'm happy with our choice.

Here's the current to-do list:

  • put up cement board and tile kitchen backsplash
  • replace kitchen light fixture
  • finish installing foot board on kitchen cabinets
  • replace switches and add light switch in kitchen
  • get or make LED under-cabinet lighting
  • paint kitchen
  • paint woodwork in our bedroom
  • replace light in entryway
  • install ceiling fan in living room (pray there is electrical in the ceiling cap)
  • get or build new vanity for bathroom
  • install new sink in bathroom
  • install new in-wall faucet in bathroom
  • replace light fixture in bathroom
  • finish making light fixture for dining room and install it
  • paint back and bedroom hallways
  • replace lights in back and bedroom hallways

Whew! That's a lot of crap! Though that should pretty much take care of the first floor renovations and we can take a nap afterwards and start saving up lots and lots for creating the second floor space.

Posted by Matt · Jul 28, 09:05 AM
  1. unreal… 1 year! Time flies

    Dan    Jul 28, 12:36 PM    #
  2. I recently passed one year since I have not done any house renovation work! The last thing I did was to renovate our lower appartment in Milwaukee where I spent about an entire month working hard labor non-stop. I’m hoping that will be my last renovation…probably not though.

    Tim    Jul 29, 12:52 PM    #
Email is required. If you put in a website your email will not be displayed. If displayed your email will be encoded to help prevent email harvest bots from finding it.
  Textile Help

: